References

Pigging:

Greenland (2021) – Pigging of pipeline
Norway, the Norwegian shelf (2019) – UT Pigging of 7,9km pipeline, subsea offshore 
Norway (2018) – UT Pigging of 11km pipeline
Norway (2016/17) – UT Pigging of 7.5km pipeline
Norway (2017) – UT Pigging of 700m pipeline

Seachest inspection:

Eq. Guniea (2021) – Seachest inspection
UK (2021) – Seachest inspection
Norway (2021) – Seachest inspection

Caisson inspection:

Norway (2021) – 2 ea. Caisson inspection
Norway (2021) – 3 ea. Caisson inspection

Remote Visual Inspection (RVI):

Lithuania (2019) – Seachest inspection
England, English shelf (2019) – Seachest inspecftion
Norway, the Norwegian shelf (2018) – Seachest inspection
Norway, the Norwegian shelf (2018) – Seachest inspection
Norway, the Norwegian shelf (2018) – Seachest inspection
England, English shelf (2018) – Seachest inspection
England, English shelf (2018) – Seachest inspectio
Norway (2018) – Inspection of gas-filled tanks, using EX-approved RVI equipment
Norway (2017/18) – Video inspection of pipelines for power companies

General NDT (Non-Destructive Testing):

Norway (2020/21) – Tank inspection
Norway (2020/21) – Boiler inspection
Norway (2020/21) – Pipeline inspection
Norway (2017/18) – LRUT (Long Range Ultrasound Testing) on ​​district heating pipes and steam pipes.
Norway, (2018) – UT inspection of train axles
Norway, (2018) – UT of pipes in power station
Norway, the Norwegian shelf (2019) – Welding control by UT / MT / PT
Norway (2018) – Tank inspection
Norway (2017) – Tank inspection
Denmark, Danish shelf (2017/18) – Inspection of exhaust pipes and structure
Norway (2018) – Inspection of steam boilers, using ET, MT, VT and video inspection
Norway (2018) – Inspection of heat exchangers, using ET, IRIS and video inspection
Norway (2017) – Inspection of pipelines according to. API 570.
Norway (2018) – MT inspection of steam boiler
Norway, the Norwegian shelf (2018) – NDT inspection underneath helideck
Norway, the North Sea (2018) – RVI of fire protection caissons